Codecom CCX - MPO Cassette Installation Video
This is a demonstration video of how to install 24 fibre MPO CCX Cassette.
IMPORTANT: It is critical that all parts and fibres are cleaned prior to installation
Stage one:
Insert the cassette into the allocated slots within the panel.
Stage two:
Remove the dust caps.
Stage three:
Plug the MPO connectors into the allocated ports.
Stage four:
Route the cables into the above cable management and insert the protective cover.